Development project control

Every gate, every phase, one sheet.

CoBuild runs a ground-up build or a renovation the way a drawing set is organized: nine stage gates from concept to close-out, ten construction phases from mobilization to certificate of occupancy, and the registers that decide whether either one moves. Pick your state and it speaks your municipality's language.

9Stage gates
10Build phases
50States supported
Phase card Rev C · 10.31.26
C0Preconstruction and mobilisationPassed
C1Demolition and abatementPassed
C2Foundations and below gradePassed
C3SuperstructureOpen
C4Envelope and dry-inNext
C5MEP rough-inOpen
C6Insulation and close-inOpen
C7Interior finishesOpen
C8Site and exterior completionOpen
C9Commissioning and closeoutOpen

The sequence

Nine gates. Nothing advances until the one before it closes.

Each gate has its own deliverables and one question that has to be answered yes. Tick the deliverables as they land; the gate tells you where you actually are.

G0

Concept

Is this worth spending diligence money on?

G1

Feasibility

Is the entitlement path defined and the margin real?

G2

Acquisition

Did diligence turn up a deal-killer?

G3

Entitlement

Are the conditions of approval acceptable?

G4

Financing and buyout

Does the contract price still support the pro forma?

G5

Construction start

Can you start without a stop?

G6

Substantial completion

Ready to produce revenue?

G7

Stabilisation or sellout

Is the exit executing on plan?

G8

Close-out

Is everything documented and released?

What you get

Six registers that decide whether the job moves.

Bulk compliance worksheet

Required against proposed, row by row, with each non-compliance classified as bulk relief or a use, density, FAR or height variance. The rows that need five of seven votes are marked, because those are the rows that change how you buy the site.

Project team

Every role on the bench with licence or registration number, verification status, and the certificate of insurance expiry date. Expiring certificates flag themselves before they lapse.

Cost report

Original budget, approved changes, committed, paid, forecast at completion. Variance calculates itself, and contingency burn is measured against how much you have actually built.

Risk register

Likelihood, cost and schedule impact, owner, mitigation, and the trigger event that tells you the risk has arrived. Reviewed monthly, not filed and forgotten.

Decision log

What was decided, by whom, why, and what it cost in dollars and days. The record nobody keeps and everybody needs two years later.

Documents and inspections

Permits, approvals, certificates and waivers with their expiry dates, plus the inspection schedule by phase. Nothing gets covered before the inspection that has to see it.

Any municipality

A variance is not called a variance everywhere.

Pick the state when you create a project and CoBuild seeds the vocabulary and procedure that state actually uses — what the board is called, what discretionary relief is called, the vote it takes, the notice radius, the appeal route and its deadline, and which code governs existing buildings. Everything stays editable, because the municipality is what really governs.

AZ

Use permit

A Board of Adjustment cannot grant a use variance at all — the route is a use permit or a rezoning.

MA

Two-thirds vote

Special permits and variances need two thirds of the board, and many bylaws forbid use variances outright.

WA

21 days

A Land Use Petition Act appeal has a 21-day window that is jurisdictional and unforgiving.

CA

Conditional Use Permit

Environmental review is usually the long pole, not the entitlement. Confirm the review class before filing.

TX

Three-quarters vote

Board of Adjustment variances need 75%. Unincorporated land may have no zoning at all.

NJ

"d" variance

Use, density, FAR and height relief needs five of seven votes, which changes how you should buy the site.

Twelve states ship with a detailed profile today. Every other state starts from model-code defaults — International Building Code, Board of Zoning Appeals, use and area variances — and you correct it once in project settings.

Two tracks

Ground-up and renovation are not the same project.

Pick a track when you create the project and CoBuild seeds the right deliverables. A renovation gets existing-conditions diligence, tenancy review, and abatement sequencing. A ground-up build gets geotechnical work, adjacent property condition surveys, and environmental review items.

Seeded on creationEditable
G0–G8Stage gates with deliverablesYes
C0–C9Construction phases with task listsYes
ZBulk compliance rowsYes
TProfessional roles to fillYes
BBudget skeletonYes
RStarting risks for the trackYes